Skip to main content

SOBCON08 David Bullock

image

Steps to creating Business Process Map

1) Speak/Write The process (get it out of your head)

2) Determine the Outcome of Every Step

3) Set the Sequence

4) Do the Process ( Physically do it)

5) Refine the process ( Incorporate the changes and do it better)

6) Rinse and Report

 

image

 

Tools:

Yellow pad

Simpleflowchart.com

Gliffy.com ( flow chart)

Flowchart.com

Drawing functions on Excel

Marketing Channels

Your Customers

Your List

Your identity

Your Successes

Internet

Offline

Comments

Popular posts from this blog

Flying Emirates 232 from Washington Dulles to Dubai - Review

Emirates flies the Airbus A380-800 from Washington DC to Dubai There was a time that flying between India and the US meant a stopover in London, Frankfurt, Paris or Amsterdam (I loved Amsterdam). However in the past decade this has changed dramatically. Now `Emirates (Dubai) Etihad (Abu Dhabi) Qatar Airways (In Doha, Qatar) have taken over these routes with their new aircraft and great service. From Washington DC, Emirates is an outlier, it flies in the morning at 10.55 from Washington Dulles Airport (IAD) and reaches Dubai at around 8.30 a.m. Other flights, Etihad, Qatar and flights with European stopovers take off after 9 p.m at night. I love this timing but it does cause a disagreement in my house. My wife prefers to fly Eithad due to the timings. My wife's viewpoint is that it is difficult to sleep on the Emirates flight since it starts in the morning. I enjoy the morning flight. My game plan is to sleep less for a few days to my Emirates flight. Once on the flig